Sunday, August 2, 2015

Shed progress

Okay okay, here's some pics of the shed in progress. This first one is the kitchen area. Note the Breville oven on the table, the pegboard on the wall, the 9.2cuft fridge, and the 10-drawer cabinet.
 This next one is the desk. There are two windows to look out of but the west one is covered right now because of the heat. Under the towel on the desk is the TV which will live on the bookcase once it's built.
 This is the closet in progress. I'm going to get some baskets to put folded things in on top of the shelves. And eventually, there will be curtains to soften the look (you can see one at the right end in process).
 And this pile of lumber will be the bookcase. It'll be 8ft long (distance between the lofts), 1 ft deep, and 3ft high. There will be four 2-ft sections for books. I have two really nice 3-step ladders, one will be on the floor to move up to the top of the case and a second one to go from the case to the loft.
When the case is done, there's only minor stuff left to do. I've begun moving backup foodstuffs (soup, boxed mac & cheese, etc) to the big cabinet. 90% of my clothes are hung up. All totes are up from Amy's basement and in one of the lofts. I need to decide where the sleeper sofa will live. Then it's all nitpicky organizing. Fun stuff. It'll be a big day/night the first time I sleep over there, but it's coming pretty soon. Yay.