Today we're going to put on the last two new tires.
Between now and Thursday morning, we're going to fix the itty bitty black tank leak with a quick and dirty repair that, Chuck says, ought to last about six months. Then I need to have a new black tank installed. Great. Another chunk of change. Let's hope there's lots of product recalls in the SF Bay area so I can pile up some dough.
We took off the spare tire (a C-load) as it no longer works for the rig. I'm donating it to Chuck for one of his many vehicles around here. The bumper had a piece of angle-iron supporting a chair rack which held the tire with many bungee cords wrapped around, most of which had frayed or busted. I was using the tire/rack as support for my sewer hose, but we're going to get a large piece of pipe to run along the bumper under the storage rack, and that will be the new place for the hose and its fittings.
Off to Mesa on Thursday morning for the RVW convention.
Monday, October 18, 2010
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment